A Cost Controller's Honest Look at LiuGong Excavators and Wheel Loaders

Tuesday 4th of August 2026By Charlotte Avery

The first Tuesday of November, I opened a spreadsheet that had been sitting in my inbox for a week. It was our 2024 equipment spend, and I hadn't looked at it carefully. That was a mistake. I'm the procurement manager at an 85-person construction company, and I've managed a $1.9 million annual fleet and tooling budget for six years. I track every invoice in a cost system. But the spreadsheet showed something I should have caught in July.

We'd spent $43,000 on emergency rentals and expedited parts in the first ten months. That's 17% of the budget. (Note to self: never ignore the monthly review again.) The issue wasn't the equipment itself. It was our process for replacing it.

Why I started comparing LiuGong excavator models

In Q3 2024, two excavators were getting expensive to run. The old 15-ton machine had 9,000 hours and was burning oil. The 25-ton machine needed undercarriage work. The standard advice was to buy a used premium-brand unit or lease. That sounds obvious, but it's not normal in this industry. Most contractors buy based on monthly payment and hope for the best. I decided to do a proper TCO comparison.

Most buyers focus on the sticker price and miss parts lead times, dealer responsiveness, and operator training. That's the outsider blind spot. The question everyone asks is 'What's your best price?' The question they should ask is 'What breaks, and how fast can I get the part?' So I asked for response time commitments, not just quotes.

I compared four liugong excavator models in the size range we needed: the 915E, 922E, and 925E, plus the smaller 9035E for a different job site. The spec sheets were comparable to the alternatives. The difference was the total cost projection. On paper, the LiuGong machines had slightly lower breakout forces than the premium-badged machine in one size class. But the specs that mattered to our operators were within reason. That's where a procurement manager has to separate marketing from actual site conditions.

According to LiuGong's global website (liugong.com, accessed January 2025), their dealer network spans more than 170 countries. In our region, the dealer confirmed parts stock for regular service items. That mattered more than a small difference in machine weight.

The quote that changed my mind

Here's where I got surprised. I assumed that a lower upfront price would mean a less polished dealer experience. It was the opposite. Our LiuGong dealer responded within 24 hours with a line-item quote. A premium-brand dealer quoted a 'package' that didn't include delivery or attachment wiring. The surprise wasn't the price difference. It was how much hidden value the LiuGong quote included: a parts availability plan, operator familiarization, and a written lead time.

People think a low price means cutting corners. That assumption gets it backwards. A dealer that can stock parts and answer the phone can afford to price competitively. The root cause of operating cost is support infrastructure, not the logo on the machine.

Our procurement policy now requires quotes from three vendors minimum. The first quote is usually the one you get when the vendor knows you're not comparing.

The LiuGong wheel loader decision

The wheel loader was actually the no-brainer. We needed a 4-5 cubic yard loader for loading trucks and handling shot rock. After the excavator review, the same dealer put together a proposal for a LiuGong wheel loader. The model was the 848H, but I care more about the support plan than the number. The loader's estimated annual fuel cost was lower than the older unit we were replacing. That came from a dealer worksheet, not a brochure.

If you've ever had a machine down during a scheduled pour, you know the moment I'm talking about. The first quote we received was from a dealer who couldn't confirm parts availability for the transmission. That was a red flag. Another quote had free setup but added a $450 freight charge in the fine print. Once we added in freight and a warranty, the LiuGong quote was in the same ballpark as the used premium-brand option. Plus, the LiuGong dealer had the major wear parts in stock at their regional warehouse. That was a game-changer for our site schedule.

The smaller purchases taught the same lesson

We had a project stop twice waiting for a specific concrete drill bit. It wasn't a budget line item; it was a maintenance tool. But the cost of waiting was 18 hours of labor. Now I ask every vendor about lead times for replacement parts and consumables, even for something as simple as a concrete drill bit.

The Subaru truck we use for parts runs is a separate line item. It isn't construction equipment, but it taught me the same thing: the lowest quote isn't the final cost. The first shop quoted $900 for a repair; the second quoted $1,200 and found a corrosion issue the first one missed. The $1,200 quote saved us a breakdown later.

Last week, the facilities manager asked me, 'How does a heat pump water heater work?' because a local utility rebate was expiring. I told him it's the same math as the excavator: compare the operating cost over ten years, not the sticker price. Then get three quotes and ask about warranty labor coverage.

Who shouldn't buy LiuGong

I recommend LiuGong for our kind of work: general excavation, site prep, and road building where dealer support is strong. But if your contract requires a specific brand, or if you're in an area with no authorized dealer for routine service, don't buy LiuGong just because the price is right. That's the honest part. No equipment brand is right for every contractor.

This solution works for us. If you're in a remote site with no dealer within a reasonable distance, you might want to consider alternatives. I'd rather tell you that now than have you blame me later.

What the audit caught

The original spreadsheet showed $43,000 in emergency spending. After we standardized the replacement process, we cut that category by an estimated 62% in the following quarter. That estimate comes from our internal cost tracking system, not a vendor claim. The total cost of ownership projection for the two excavators and the loader came in 18% below the premium-brand quotes over a five-year period.

I still kick myself for not doing this earlier. More importantly, I built a TCO template that now lives in our shared drive. Every equipment quote goes into it, including parts, downtime risk, operator training, and disposal value.

Bottom line: compare machines by the cost of owning them, not the cost of buying them.

Have a Question About This Topic?

Our application engineers can provide project-specific advice based on your equipment needs.

Ask an Expert